Terminal Specifications
PIER II |
EAST Side |
WEST Side |
Operational Quayside |
787 meters |
698 meters |
Total Operational Quayside for PIER II: 1.485 meters |
||
Safe draft / Depth |
14.5 meters |
16.5 meters |
QC Cranes |
10 QCs QCs Nos.: 1, 4, 5, 6, 11, 12, 13, 14, 19, 20. |
8 QCs QCs Nos.: 9, 8, 7, 10, 15, 16, 17, 18. |
12 Post Panamax (PP) QCs through Concession & 6 new Super Post Panamax (SPP) QC’s 24 rows twin spreader. |
||
RMGs / E-RTGs |
16 E-RTGs E-RTGs Nos.: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16. |
16 semi – automated RMGs: RMGs Nos.: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16. |
4 E–RTGs between Pier II & Pier III 1 E-RTG in the Train area |
||
Reefer Points |
760 reefer plugs for 1090 reefer Teus |
|
Storage Area |
||
Total Area |
||
Throughput |
3.2 million Teus |
PIER III |
EAST Side |
WEST Side |
Operational Quayside |
600 meters |
762 meters |
Total Operational Quayside for PIER III: 1.362 meters |
||
Safe draft / Depth |
18.5 meters |
19.5 meters |
QC Cranes |
5 QCs QCs Nos.: 31, 32, 33, 34, 35 5 Super Super Post Panamax (SSPP) QCs new generation 26 rows tandem spreader |
8 QCs QCs Nos.: 36, 37, 38, 39, 40 , 41, 42 , 43 8 Super Super Post Panamax (SSPP) QCs new generation 26 rows tandem spreader |
RMGs / E-RTGs |
6 RMGs |
18 ERTGs |
4 E–RTGs between Pier II & Pier III 1 E-RTG in the Train area |
||
Reefer Points |
|
|
Storage Area |
||
Total Area |
||
Throughput |
3 million Teus |